The Others tab contains other Control related items you can define and configure at the organizational and project level.
The following items are Control related settings you can define and configure at the organizational level:
Required cost items
Change order details
The Required cost items feature lets you create standardized or most commonly used cost items at the organization level and then add them to the project structure in the CBS register.
You can turned to ON the Prevent project from syncing if required cost items are not added toggle to prevent the project from syncing if required cost items are not added.
In the cost item grid, you can add, edit, and delete required cost items.
Change Order fields can be configured as validated drop-down list fields at the organization level.
When you set the toggle to ON, the discipline list is populated from Master Data Libraries in InEight Platform, and the issue number and CCO fields are populated from inEight Change. When the toggle is set to OFF, these fields are free editable text fields with no validations.
In the example below, six validated issues have been selected to be associated with this change order after it is submitted.
The following items are Control related settings you can define and configure at the project level:
Required cost items
Decimal precision
You can prevent the project from syncing when required cost items are not included by setting the Prevent project from syncing if required cost items are not added toggle to ON.
The image and table below summarize the different decimal precision options:
| Name | Function | |
|---|---|---|
| 1 | Currency | Number of decimal places for currencies. Any field that includes currency data will be affected by this setting. |
| 2 | Cost Summary | Number of decimal places for total cost information both at the terminal and non-terminal level. |
| 3 | Unit Cost | Number of decimal places for any unit cost displayed. |
| 4 | Quantities | Number of decimal places for any quantities displayed. |
| 5 | Percentages | Percent complete calculations at both the terminal and non-terminal level. |
Additional Information